——Fenghua Architecture Tianhai Project Observation Meeting
In order to effectively improve the competitiveness of delivery, from September 2022 to 9, 16, Fenghua Construction held a two-day on-site observation seminar in the Tianhai project, with nearly 17 people from project delivery, design, sales, procurement, production, quality inspection and other departments participating. Tianhai project is an EPC contracting mode, with a contract amount of 40 million yuan and a total construction area of 1,27 square meters, including six monomers, including production 88846# workshop, 1# workshop, 2# workshop, 3# workshop, office building and comprehensive building. The structural forms include sandwich frame, portal steel frame, steel frame structure, etc.

In order to ensure the effect of this on-site observation, the project team carefully formulated the observation planning plan.
Sun Chao, project manager of Tianhai, introduced the overview, construction difficulties and corresponding control measures of Tianhai Project, and shared the results and management experience with everyone in terms of safety, quality, progress and on-site management.

After the safety training, the observation team was divided into 6 groups to enter the site in an orderly manner and carry out observation and learning activities according to the civil and steel structure design blueprints and construction standards.

In the evening, in view of the highlights and points to be improved in the observation process, each group, led by the team leader, conducted intense discussions on key points such as quality, safety, progress, and cost. Each group worked together to brainstorm and complete the "observation and summary".

In the morning of the second day, the groups shared their observations one by one. The PK mechanism was adopted for sharing, and six team leaders served as judges. The group sent representatives to the stage to share: Chen Kangkang, as a structural designer, analyzed some problems of civil construction from the design perspective; Shen Haihua deepened the design, put forward the proposal of "construction standardization", and shared practical skills such as the algorithm of high-strength bolts and how to install components using mechanical principles. Project manager Li Lei chose the two problems of the water surface of the Shunpo gas building and the lapping of the lighting belt, combined with the practices of friendly businessmen, and put forward our improvement suggestions...

The judges voted closely around the dimensions of report quality, contribution, and whether it was instructive, and finally the third and fourth groups won the first and second places respectively in this observation activity.

Through observation and summary, everyone further realized that the project manager position has great responsibilities and needs to work carefully around safety, quality, planning, cost, 5S and other aspects. Observation is to review the project, good experience should be accumulated and precipitated, and standard actions should be formed; Develop solutions to existing problems, rectify in time, and reduce and eliminate quality problems.
In order to ensure the quality of the project and achieve system cost reduction, Fenghua Company will sort out the relevant processes and modify the relevant systems; In order to enhance the comprehensive competitiveness, we have begun to improve and upgrade standardization since June, and pull through the standardization of technology, production, procurement, delivery and other links.
The successful holding of the Tianhai project observation and learning has created valuable opportunities for personnel in different positions of the company to communicate, so that everyone has a deeper understanding of engineering design and installation. Every observation meeting is a precious learning opportunity, especially in the past two years of project delivery injected a lot of fresh blood, I believe their participation will make us more energetic, hope to take this observation meeting as an opportunity to summarize precipitation, store energy for the future, and help achieve the goal of tens of billions!